Quick answer
After Checklist, spot-check the output, then decide whether to delete/archive the original; keep a backup. Checklist covers type/equipment/safety/contract.
Why it matters
A backup lets you roll back if the output is wrong.
Type.
Step by step
- Check type/size/material/equipment/permits/lot.
- Separate excavation/structure/liner/equipment/fence/landscape.
- Get 2-3 quotes; confirm scope/equipment/warranty.
- Contract states scope/timeline/payment/warranty.
Common mistakes
- Pool price only, not equipment/landscape.
- Ignoring permits/fence/safety.
- Not checking liner/equipment/warranty.
- No timeline/change terms.
Checklist
- Type/size/material/equipment/permits.
- Excavation/structure/liner/equipment/fence.
- Safety/drainage/landscape/timeline.
- Warranty/payment/contract.
- Budget/maintenance/insurance.
Key facts
- Type.
- Equipment.
- Safety.
FAQ
What should I do after Checklist?
After Checklist, spot-check the output, then decide whether to delete/archive the original; keep a backup. Checklist covers type/equipment/safety/contract.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: PHTA