Home/Answers/Contract
POOL COST LAB / Contract

How to Set Up Contract

To set up Contract, confirm the input format/device, choose output settings, then run a small batch.

Updated 2026-11-01About 3 minLocal test
Quick answer

To set up Contract, confirm the input format/device, choose output settings, then run a small batch. Contract states scope/timeline/payment/warranty.

Why it matters

Validate on a small sample before running the whole batch.

Scope.

Step by step

  1. Check type/size/material/equipment/permits/lot.
  2. Separate excavation/structure/liner/equipment/fence/landscape.
  3. Get 2-3 quotes; confirm scope/equipment/warranty.
  4. Contract states scope/timeline/payment/warranty.

Common mistakes

  • Pool price only, not equipment/landscape.
  • Ignoring permits/fence/safety.
  • Not checking liner/equipment/warranty.
  • No timeline/change terms.

Checklist

  • Type/size/material/equipment/permits.
  • Excavation/structure/liner/equipment/fence.
  • Safety/drainage/landscape/timeline.
  • Warranty/payment/contract.
  • Budget/maintenance/insurance.

Key facts

  • Scope.
  • Timeline.
  • Warranty.

FAQ

How do I set up Contract?

To set up Contract, confirm the input format/device, choose output settings, then run a small batch. Contract states scope/timeline/payment/warranty.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Angi